Polk, WI interconnection queue

2 active projects totaling 200 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2active projects
200active MW
3total filed
Queue IDProjectkVMWResourceStatus
J129 Not reported n/r 300 Gas Withdrawn
J1314 Not reported 161 100 Solar Active
S1039 Surplus; J1314 161 100 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.