Substation Scout

MISO request J1272

MISO queue ID J1272

Queue request J1272 was listed in the MISO interconnection queue at the end of 2025 as a 50 MW battery project in Vanderburgh County, IN, according to Berkeley Lab’s queue data file. The filing names Angel Mound Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of July 1, 2025.

Queue IDJ1272
Project nameNot reported
Status (as published)Active
SubstationAngel Mound Substation
Point of interconnectionAngel Mound 138kV Substation
CountyVanderburgh
StateIN
Voltage138 kV
Capacity50 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2025-07-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Vanderburgh, IN: 4 requests in the MISO queue, 2 active totaling 250 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySouthern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.
ClusterDPP-2019 Central
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Construction
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: Under Construction
Queue date2019-04-29
Interconnection agreement date2022-09-02

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.