Vanderburgh, IN interconnection queue

2 active projects totaling 250 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2active projects
250active MW
4total filed
Queue IDProjectkVMWResourceStatus
J3249 Not reported 138 200 Battery Active
J1271 Not reported 138 100 Battery Withdrawn
J856 Not reported 138 80 Solar Withdrawn
J1272 Not reported 138 50 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.