MISO request J1262

MISO queue ID J1262

Queue request J1262 was listed in the MISO interconnection queue at the end of 2025 as a 25 MW gas project in Wayne County, MI, according to Berkeley Lab’s queue data file. The filing names Waterman Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2022.

Queue IDJ1262
Project nameNot reported
Status (as published)Active
SubstationWaterman Substation
Point of interconnectionWaterman 120kV Substation
CountyWayne
StateMI
Voltage120 kV
Capacity25 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2022-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Wayne, MI: 23 requests in the MISO queue, 12 active totaling 2,589.5 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityITC MIDWEST
ClusterDPP-2019 East (ITC)
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Study Phase: GIA Complete; Post GIA Status: Not Started
Queue date2019-04-29
Interconnection agreement date2022-08-17

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first