MISO request J1249

MISO queue ID J1249

Queue request J1249 was listed in the MISO interconnection queue at the end of 2025 as a 600 MW gas project in Lamar County, MS, according to Berkeley Lab’s queue data file. The filing names Morrow Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of July 24, 2022.

Queue IDJ1249
Project nameNot reported
Status (as published)Operational
SubstationMorrow Substation
Point of interconnectionMorrow 161 kV Substation
CountyLamar
StateMS
Voltage161 kV
Capacity600 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2022-07-24
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Lamar, MS: 4 requests in the MISO queue, 3 active totaling 704 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityCOOPERATIVE ENERGY
ClusterDPP-2019 South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Study Phase: GIA Complete; Post GIA Status: In Service
Queue date2019-04-29
Interconnection agreement date2022-01-20
Operational date2022-07-24

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first