Lamar, MS interconnection queue

3 active projects totaling 704 MW in the MISO queue, plus 1 with terminal status (shown grayed).

3active projects
704active MW
4total filed
Queue IDProjectkVMWResourceStatus
J1249 Not reported 161 600 Gas Operational
J2321 Not reported 161 180 Hybrid Withdrawn
J473 Not reported n/r 52 Solar Operational
J791 Not reported n/r 52 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.