Substation Scout

MISO request J1124

MISO queue ID J1124

Queue request J1124 was listed in the MISO interconnection queue at the end of 2025 as a 100 MW solar project in Olmsted County, MN, according to Berkeley Lab’s queue data file. The filing names Byron Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2024.

Queue IDJ1124
Project nameNot reported
Status (as published)Active
SubstationByron Substation
Point of interconnectionByron 345kV Substation
CountyOlmsted
StateMN
Voltage345 kV
Capacity100 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2024-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Byron Substation substation: 6 requests in the MISO queue, 2 active totaling 313.5 MW.

Queue IDProjectMWResourceStatus
E0006Sandhill Energy Storage213.5BatteryActive
J371Not reported2,325NuclearWithdrawn
J067Not reported300WindWithdrawn
J2037Not reported200SolarWithdrawn
J441Not reported170WindWithdrawn

Olmsted, MN: 19 requests in the MISO queue, 11 active totaling 1,639.9 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySMMPA
ClusterDPP-2018-APR West
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Construction
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: Under Construction
Queue date2018-03-12
Interconnection agreement date2021-06-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.