Sandhill Energy Storage

MISO queue ID E0006

Sandhill Energy Storage (E0006) was listed in the MISO interconnection queue at the end of 2025 as a 213.5 MW battery project in Olmsted County, MN, according to Berkeley Lab’s queue data file. The filing names Byron Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 30, 2025.

Queue IDE0006
Project nameSandhill Energy Storage
Status (as published)Active
SubstationByron Substation
Point of interconnectionByron 345kV Substation
CountyOlmsted
StateMN
Voltage345 kV
Capacity213.5 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2025-09-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Byron Substation substation: 6 requests in the MISO queue, 2 active totaling 313.5 MW.

Queue IDProjectMWResourceStatus
J1124Not reported100SolarActive
J371Not reported2,325NuclearWithdrawn
J067Not reported300WindWithdrawn
J2037Not reported200SolarWithdrawn
J441Not reported170WindWithdrawn

Olmsted, MN: 19 requests in the MISO queue, 11 active totaling 1,639.9 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityXcel Energy
DeveloperXcel Energy
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Request Status: Active; Post GIA Status: Not started
Queue date2025-08-06

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.