Substation Scout

MISO request J112

MISO queue ID J112

Queue request J112 was listed in the MISO interconnection queue at the end of 2025 as a 4.9 MW wind project in Winona County, MN, according to Berkeley Lab’s queue data file. The filing names Utica - Lewiston as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of July 14, 2009.

Queue IDJ112
Project nameNot reported
Status (as published)Operational
SubstationUtica - Lewiston
Point of interconnectionUtica - Lewiston 69 kV
CountyWinona
StateMN
Voltage69 kV
Capacity4.9 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2009-07-14
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Winona, MN: 2 requests in the MISO queue, 1 active totaling 4.9 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2012-AUG West
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2010-01-25
Interconnection agreement date2013-09-16
Operational date2009-07-14

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first