Queue request J1115 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW wind project in Macon County, IL, according to Berkeley Lab’s queue data file. The filing names Latham - Oreana Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2024.
| Queue ID | J1115 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Latham - Oreana Line |
| Point of interconnection | Latham - Oreana 345kV Line |
| County | Macon |
| State | IL |
| Voltage | 345 kV |
| Capacity | 200 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Proposed online date | 2024-09-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Macon, IL: 14 requests in the MISO queue, 8 active totaling 1,600.3 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | AMEREN ILLINOIS |
|---|---|
| Cluster | DPP-2018-APR Central |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Construction |
| Study phase (as the queue printed it) | Study Phase: GIA; Post GIA Status: Under Construction |
| Queue date | 2018-03-12 |
| Interconnection agreement date | 2021-10-12 |