Macon, IL interconnection queue

8 active projects totaling 1,600.3 MW in the MISO queue, plus 6 with terminal status (shown grayed).

8active projects
1,600.3active MW
14total filed
Queue IDProjectkVMWResourceStatus
J1839 Not reported 138 340.3 Gas Active
J3417 Not reported n/r 300 Battery Active
J1115 Not reported 345 200 Wind Active
J2388 Not reported n/r 200 Hybrid Active
J872 Not reported 138 200 Wind Withdrawn
J1677 Not reported 345 180 Solar Active
J2656 Not reported 138 180 Solar Active
J125 Not reported 345 151.2 Wind Withdrawn
J1713 Not reported 138 147.2 Wind Withdrawn
J159 Not reported 138 101.2 Wind Withdrawn
J160 Not reported 138 101.2 Wind Withdrawn
J2375 Not reported n/r 100 Battery Active
J2383 Not reported n/r 100 Battery Active
J2115 Not reported 138 98.3 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.