MISO request J1092

MISO queue ID J1092

Queue request J1092 was listed in the MISO interconnection queue at the end of 2025 as a 100 MW solar project in St. Croix County, WI, according to Berkeley Lab’s queue data file. The filing names Three Lakes Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 1, 2023.

Queue IDJ1092
Project nameNot reported
Status (as published)Active
SubstationThree Lakes Substation
Point of interconnectionThree Lakes 115 kV Substation
CountySt. Croix
StateWI
Voltage115 kV
Capacity100 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2023-10-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

St. Croix, WI: 9 requests in the MISO queue, 3 active totaling 301.3 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityNORTHERN STATES POWER COMPANY
ClusterDPP-2018-APR West
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: Not Started
Queue date2018-03-12
Interconnection agreement date2021-06-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.