St. Croix, WI interconnection queue

3 active projects totaling 301.3 MW in the MISO queue, plus 6 with terminal status (shown grayed).

3active projects
301.3active MW
9total filed
Queue IDProjectkVMWResourceStatus
J1582 Not reported 115 160 Solar Withdrawn
J3476 Not reported 161 150 Solar Withdrawn
J2621 Not reported 161 115 Battery Withdrawn
J926 Not reported 161 101.3 Solar Active
J1092 Not reported 115 100 Solar Active
J1657 Not reported 161 100 Solar Active
J2070 Not reported 115 100 Solar Withdrawn
J177 Not reported 161 97.5 Wind Withdrawn
J221 Not reported 161 5 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.