Queue request J1087 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW solar project in Scott County, MO, according to Berkeley Lab’s queue data file. The filing names Miner - Kelso Line Tap as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 2, 2023.

Queue IDJ1087
Project nameNot reported
Status (as published)Active
SubstationMiner - Kelso Line Tap
Point of interconnectionMiner - Kelso 161 kV Line Tap
CountyScott
StateMO
Voltage161 kV
Capacity200 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2023-12-02
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Miner - Kelso Line Tap substation: 3 requests in the MISO queue, 1 active totaling 200 MW.

Queue IDProjectMWResourceStatus
J985Not reported120SolarWithdrawn
J1161Not reported100.2SolarWithdrawn

Scott, MO: 7 requests in the MISO queue, 3 active totaling 556 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAmeren Missouri
ClusterDPP-2018-APR Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Construction
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: Under Construction
Queue date2018-03-12
Interconnection agreement date2021-10-12
Withdrawn date2025-09-16

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first