MISO request J1040
MISO queue ID J1040
Queue request J1040 was listed in the MISO interconnection queue at the end of 2025 as a 250 MW wind project in Mcintosh County, ND, according to Berkeley Lab’s queue data file. The filing names Wishek Junction Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 14, 2023.
| Queue ID | J1040 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Wishek Junction Substation |
| Point of interconnection | Wishek Junction 230 kV Substation |
| County | Mcintosh |
| State | ND |
| Voltage | 230 kV |
| Capacity | 250 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Proposed online date | 2023-05-14 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Mcintosh, ND: 11 requests in the MISO queue, 2 active totaling 262 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | MONTANA-DAKOTA UTILITIES CO. |
|---|---|
| Cluster | DPP-2018-APR West |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Construction |
| Study phase (as the queue printed it) | Study Phase: GIA; Post GIA Status: Under Construction |
| Queue date | 2018-03-12 |
| Interconnection agreement date | 2022-02-07 |