Substation Scout

Mcintosh, ND interconnection queue

2 active projects totaling 262 MW in the MISO queue, plus 9 with terminal status (shown grayed).

2active projects
262active MW
11total filed
Queue IDProjectkVMWResourceStatus
J1040 Not reported 230 250 Wind Active
J209 Not reported 230 250 Wind Withdrawn
G988 Not reported 230 200 Wind Withdrawn
G624 Not reported 115 150 Wind Withdrawn
J929 Not reported 41.6 25 Solar Withdrawn
G283 Not reported n/r 19 Wind Withdrawn
G307 Not reported n/r 19 Wind Withdrawn
G308 Not reported n/r 19 Wind Withdrawn
G150 Not reported n/r 12 Other Active
G151 Not reported n/r 12 Other Withdrawn
G710 Not reported n/r 10 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.