Substation Scout

MISO request J023

MISO queue ID J023

Queue request J023 was listed in the MISO interconnection queue at the end of 2025 as a 6 MW nuclear project in Manitowoc County, WI, according to Berkeley Lab’s queue data file. The filing names Point Beach Nuclear Plant Unit 2 as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of October 1, 2007.

Queue IDJ023
Project nameNot reported
Status (as published)Operational
SubstationPoint Beach Nuclear Plant Unit 2
Point of interconnectionPoint Beach Nuclear Plant Unit 2
CountyManitowoc
StateWI
VoltageNot reported
Capacity6 MW
Resource (as published)Nuclear
Resource categoryNuclear (normalized for filtering)
Proposed online date2007-10-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Manitowoc, WI: 16 requests in the MISO queue, 7 active totaling 422 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2009-JUL
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2009-01-14
Interconnection agreement date2010-07-12
Operational date2007-10-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first