Manitowoc, WI interconnection queue
7 active projects totaling 422 MW in the MISO queue, plus 9 with terminal status (shown grayed).
7active projects
422active MW
16total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J383 | Not reported | n/r | 571 | Gas | Withdrawn |
| J094 | Not reported | 138 | 200 | Wind | Withdrawn |
| J2218 | Not reported | n/r | 150 | Battery | Withdrawn |
| J886 | Not reported | 138 | 150 | Solar | Operational |
| J657 | Not reported | 138 | 100.8 | Wind | Withdrawn |
| G013 | Not reported | n/r | 99 | Other | Withdrawn |
| G384 | Not reported | 138 | 99 | Wind | Withdrawn |
| J505 | Not reported | 138 | 99 | Solar | Operational |
| G063 | Not reported | n/r | 90 | Other | Withdrawn |
| G240 | Not reported | n/r | 55 | Gas | Operational |
| G833 | Not reported | n/r | 53 | Nuclear | Operational |
| G834 | Not reported | n/r | 53 | Nuclear | Operational |
| J1101 | Not reported | 138 | 20 | Battery | Withdrawn |
| R1002 | Replace 11.4 of WPS.LAKEFRN96 Unit with natural gas (with diesel as a backup); Lakefront 9 | 69 | 11.4 | Hybrid | Withdrawn |
| J022 | Not reported | n/r | 6 | Nuclear | Operational |
| J023 | Not reported | n/r | 6 | Nuclear | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.