MISO request H092

MISO queue ID H092

Queue request H092 was listed in the MISO interconnection queue at the end of 2025 as a 60 MW coal project in Itasca County, MN, according to Berkeley Lab’s queue data file. The filing names MP Boswell Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 31, 2010.

Queue IDH092
Project nameNot reported
Status (as published)Operational
SubstationMP Boswell Substation
Point of interconnectionMP Boswell Substation
CountyItasca
StateMN
VoltageNot reported
Capacity60 MW
Resource (as published)Coal
Resource categoryCoal (normalized for filtering)
Proposed online date2010-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Itasca, MN: 10 requests in the MISO queue, 3 active totaling 346.8 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2008-NOV MN
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2008-07-25
Interconnection agreement date2010-09-01
Operational date2010-12-31

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.