Itasca, MN interconnection queue

3 active projects totaling 346.8 MW in the MISO queue, plus 7 with terminal status (shown grayed).

3active projects
346.8active MW
10total filed
Queue IDProjectkVMWResourceStatus
G597 Not reported 115 606 Coal Withdrawn
G519 Not reported 115 600 Coal Withdrawn
S1098 Surplus; J1058 230 364.5 Solar Withdrawn
G800 Not reported 230 250 Gas Withdrawn
G120 Not reported n/r 225 Other Withdrawn
J3703 Not reported 115 200 Battery Active
J3863 Not reported 230 200 Solar Withdrawn
E0011 Boswell Solar Project 230 86.8 Solar Active
J3237 Not reported 115 86 Wind Withdrawn
H092 Not reported n/r 60 Coal Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.