Queue request G989 was listed in the MISO interconnection queue at the end of 2025 as a 330 MW coal project in Clermont County, OH, according to Berkeley Lab’s queue data file. The filing names Zimmer Station as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 1, 2010.

Queue IDG989
Project nameNot reported
Status (as published)Operational
SubstationZimmer Station
Point of interconnectionZimmer 345 kV Station
CountyClermont
StateOH
Voltage345 kV
Capacity330 MW
Resource (as published)Coal
Resource categoryCoal (normalized for filtering)
Proposed online date2010-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Clermont, OH: 2 requests in the MISO queue, 2 active totaling 382 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)SPA - SIS
Queue date2008-03-21
Interconnection agreement date2008-06-02
Operational date2010-12-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.