Clermont, OH interconnection queue
2 active projects totaling 382 MW in the MISO queue.
2active projects
382active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G989 | Not reported | 345 | 330 | Coal | Operational |
| G990 | Not reported | 345 | 52 | Coal | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.
Site Scanner