MISO queue ID G971

Queue request G971 was listed in the MISO interconnection queue at the end of 2025 as a 20 MW wind project in Meeker County, MN, according to Berkeley Lab’s queue data file. The filing names line in SE 1/4 of Sec 17 in Cosmos Twp as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of November 1, 2009.

Queue IDG971
Project nameNot reported
Status (as published)Operational
Substationline in SE 1/4 of Sec 17 in Cosmos Twp
Point of interconnection69 kV line in SE 1/4 of Sec 17 in Cosmos Twp
CountyMeeker
StateMN
Voltage69 kV
Capacity20 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2009-11-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Meeker, MN: 8 requests in the MISO queue, 4 active totaling 740 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2009-MAR MN
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2008-02-13
Interconnection agreement date2010-09-16
Operational date2009-11-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first