4 active projects totaling 740 MW in the MISO queue, plus 4 with terminal status (shown grayed).

4active projects
740active MW
8total filed
Queue IDProjectkVMWResourceStatus
J4194 Not reported n/r 500 Battery Active
J625 Not reported 345 400 Wind Withdrawn
J626 Not reported n/r 400 Wind Withdrawn
J627 Not reported n/r 400 Wind Withdrawn
H050 Not reported 115 200 Wind Withdrawn
J4193 Not reported n/r 200 Wind Active
G685 Not reported 69 20 Wind Operational
G971 Not reported 69 20 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.