Substation Scout

MISO request G938

MISO queue ID G938

Queue request G938 was listed in the MISO interconnection queue at the end of 2025 as a 1 MW hydro project in Newaygo County, MI, according to Berkeley Lab’s queue data file. The filing names Hardy - Croton as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of October 1, 2010.

Queue IDG938
Project nameNot reported
Status (as published)Operational
SubstationHardy - Croton
Point of interconnectionHardy - Croton 138kV
CountyNewaygo
StateMI
Voltage138 kV
Capacity1 MW
Resource (as published)Hydro
Resource categoryHydro (normalized for filtering)
Proposed online date2010-10-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Newaygo, MI: 2 requests in the MISO queue, 2 active totaling 221 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2007-12-20
Interconnection agreement date2008-07-24
Operational date2010-10-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.