Newaygo, MI interconnection queue

2 active projects totaling 221 MW in the MISO queue.

2active projects
221active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2001 Not reported 345 220 Solar Active
G938 Not reported 138 1 Hydro Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.