MISO queue ID G849

Queue request G849 was listed in the MISO interconnection queue at the end of 2025 as a 84 MW hydro project in Perry County, IN, according to Berkeley Lab’s queue data file. The filing names Cloverport Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of January 15, 2014.

Queue IDG849
Project nameNot reported
Status (as published)Operational
SubstationCloverport Substation
Point of interconnectionCloverport 138 kV Substation
CountyPerry
StateIN
Voltage138 kV
Capacity84 MW
Resource (as published)Hydro
Resource categoryHydro (normalized for filtering)
Proposed online date2014-01-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Cloverport Substation substation: 2 requests in the MISO queue, 2 active totaling 179 MW.

Queue IDProjectMWResourceStatus
G032Not reported95HydroOperational

Perry, IN: 2 requests in the MISO queue, 2 active totaling 87.9 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterPre-Transition SIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2007-09-06
Interconnection agreement date2009-12-17
Operational date2016-06-07

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.