Substation Scout

MISO request G848

MISO queue ID G848

Queue request G848 was listed in the MISO interconnection queue at the end of 2025 as a 80 MW hydro project in Livingston County, KY, according to Berkeley Lab’s queue data file. The filing names Renshaw - Livingston as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of November 15, 2007.

Queue IDG848
Project nameNot reported
Status (as published)Operational
SubstationRenshaw - Livingston
Point of interconnectionRenshaw - Livingston 161 kV
CountyLivingston
StateKY
Voltage161 kV
Capacity80 MW
Resource (as published)Hydro
Resource categoryHydro (normalized for filtering)
Proposed online date2007-11-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Livingston, KY: 3 requests in the MISO queue, 2 active totaling 122 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2008-NOV Individual
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2007-09-06
Interconnection agreement date2012-07-06
Operational date2007-11-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first