Livingston, KY interconnection queue

2 active projects totaling 122 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2active projects
122active MW
3total filed
Queue IDProjectkVMWResourceStatus
G848 Not reported 161 80 Hydro Operational
J2836 Not reported 69 45 Hybrid Withdrawn
J2756 Not reported 69 42 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.