MISO queue ID G767

Queue request G767 was listed in the MISO interconnection queue at the end of 2025 as a 30 MW wind project in Fallon County, MT, according to Berkeley Lab’s queue data file. The filing names existing line as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 1, 2009.

Queue IDG767
Project nameNot reported
Status (as published)Operational
Substationexisting line
Point of interconnectionexisting 57 kV line
CountyFallon
StateMT
Voltage57 kV
Capacity30 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2009-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Fallon, MT: 4 requests in the MISO queue, 1 active totaling 30 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2009-MAR
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2007-03-20
Interconnection agreement date2007-12-21
Operational date2009-12-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.