Substation Scout

Fallon, MT interconnection queue

1 active project totaling 30 MW in the MISO queue, plus 3 with terminal status (shown grayed).

1active projects
30active MW
4total filed
Queue IDProjectkVMWResourceStatus
G753 Not reported 230 300 Wind Withdrawn
G891 Not reported 115 42 Gas Withdrawn
G767 Not reported 57 30 Wind Operational
J1766 Not reported 115 20 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first