MISO request G612
MISO queue ID G612
Queue request G612 was listed in the MISO interconnection queue at the end of 2025 as a 150 MW wind project in Story County, IA, according to Berkeley Lab’s queue data file. The filing names ITC Midwest Fernald Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of May 15, 2007.
| Queue ID | G612 |
|---|---|
| Project name | Not reported |
| Status (as published) | Operational |
| Substation | ITC Midwest Fernald Substation |
| Point of interconnection | ITC Midwest Fernald 115 kV Substation |
| County | Story |
| State | IA |
| Voltage | 115 kV |
| Capacity | 150 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Proposed online date | 2007-05-15 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
ITC Midwest Fernald Substation substation: 2 requests in the MISO queue, 2 active totaling 300 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| G798 | Not reported | 150 | Wind | Operational |
Story, IA: 12 requests in the MISO queue, 4 active totaling 700 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Cluster | CS5 |
|---|---|
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | DPP - SIS |
| Queue date | 2006-03-20 |
| Interconnection agreement date | 2008-07-09 |
| Operational date | 2007-05-15 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.