Substation Scout

Story, IA interconnection queue

4 active projects totaling 700 MW in the MISO queue, plus 8 with terminal status (shown grayed).

4active projects
700active MW
12total filed
Queue IDProjectkVMWResourceStatus
J2078 Not reported n/r 200 Solar Active
J3464 Not reported n/r 200 Solar Active
G612 Not reported 115 150 Wind Operational
G798 Not reported 115 150 Wind Operational
J2106 Not reported 161 150 Wind Withdrawn
G499 Not reported 115 109.5 Wind Withdrawn
J1321 Not reported 345 65 Battery Withdrawn
J1728 Not reported 161 39 Wind Withdrawn
J1801 Not reported 161 39 Wind Withdrawn
J103 Not reported 161 20 Wind Withdrawn
J764 Not reported n/r 12 Wind Withdrawn
J768 Not reported n/r 12 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first