Substation Scout

MISO request G481

MISO queue ID G481

Queue request G481 was listed in the MISO interconnection queue at the end of 2025 as a 1 MW wind project in Rolette County, ND, according to Berkeley Lab’s queue data file. The filing names Belcourt Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of March 15, 2007.

Queue IDG481
Project nameNot reported
Status (as published)Operational
SubstationBelcourt Substation
Point of interconnectionBelcourt 69kV Substation
CountyRolette
StateND
Voltage69 kV
Capacity1 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2007-03-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Rolette, ND: 5 requests in the MISO queue, 2 active totaling 151 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterG481 G481
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2004-11-01
Interconnection agreement date2005-05-11
Operational date2007-03-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.