MISO request G481
MISO queue ID G481
Queue request G481 was listed in the MISO interconnection queue at the end of 2025 as a 1 MW wind project in Rolette County, ND, according to Berkeley Lab’s queue data file. The filing names Belcourt Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of March 15, 2007.
| Queue ID | G481 |
|---|---|
| Project name | Not reported |
| Status (as published) | Operational |
| Substation | Belcourt Substation |
| Point of interconnection | Belcourt 69kV Substation |
| County | Rolette |
| State | ND |
| Voltage | 69 kV |
| Capacity | 1 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Proposed online date | 2007-03-15 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Rolette, ND: 5 requests in the MISO queue, 2 active totaling 151 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Cluster | G481 G481 |
|---|---|
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | Network Upgrade |
| Queue date | 2004-11-01 |
| Interconnection agreement date | 2005-05-11 |
| Operational date | 2007-03-15 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.