2 active projects totaling 151 MW in the MISO queue, plus 3 with terminal status (shown grayed).

2active projects
151active MW
5total filed
Queue IDProjectkVMWResourceStatus
G904 Not reported 230 150 Wind Withdrawn
J2019 Not reported 230 150 Wind Withdrawn
J290 Not reported 230 150 Wind Operational
G450 Not reported n/r 1 Wind Withdrawn
G481 Not reported 69 1 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.