Substation Scout

MISO request G417

MISO queue ID G417

Queue request G417 was listed in the MISO interconnection queue at the end of 2025 as a 15 MW project in Scott County, MN, according to Berkeley Lab’s queue data file. The filing names Shakopee - Scott as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of June 1, 2006.

Queue IDG417
Project nameNot reported
Status (as published)Operational
SubstationShakopee - Scott
Point of interconnectionShakopee - Scott 69 kV
CountyScott
StateMN
Voltage69 kV
Capacity15 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2006-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Scott, MN: 10 requests in the MISO queue, 5 active totaling 562.5 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterG417 G417
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2004-03-22
Interconnection agreement date2007-09-28
Operational date2006-06-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first