Scott, MN interconnection queue
5 active projects totaling 562.5 MW in the MISO queue, plus 5 with terminal status (shown grayed).
5active projects
562.5active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G895 | Not reported | 115 | 1,500 | Wind | Withdrawn |
| G896 | Not reported | 345 | 1,500 | Wind | Withdrawn |
| G266 | Not reported | n/r | 1,005 | Gas | Withdrawn |
| G369 | Not reported | 115 | 385 | Gas | Operational |
| J2200 | Not reported | n/r | 200 | Battery | Withdrawn |
| J3369 | Not reported | n/r | 200 | Battery | Withdrawn |
| R1050 | Replacing 135.5 MW with 135.5 MW BESS; Blue Lake Units 1 2 4 | 115 | 135.5 | Hybrid | Active |
| R1051 | Replacing 55 MW with 29 MW Natural Gas/Fuel Oil; Blue Lake Unit 3 | 115 | 55 | Hybrid | Active |
| G417 | Not reported | 69 | 15 | Other | Operational |
| L002 | Not reported | n/r | -28 | Other | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.