Scott, MN interconnection queue

5 active projects totaling 562.5 MW in the MISO queue, plus 5 with terminal status (shown grayed).

5active projects
562.5active MW
10total filed
Queue IDProjectkVMWResourceStatus
G895 Not reported 115 1,500 Wind Withdrawn
G896 Not reported 345 1,500 Wind Withdrawn
G266 Not reported n/r 1,005 Gas Withdrawn
G369 Not reported 115 385 Gas Operational
J2200 Not reported n/r 200 Battery Withdrawn
J3369 Not reported n/r 200 Battery Withdrawn
R1050 Replacing 135.5 MW with 135.5 MW BESS; Blue Lake Units 1 2 4 115 135.5 Hybrid Active
R1051 Replacing 55 MW with 29 MW Natural Gas/Fuel Oil; Blue Lake Unit 3 115 55 Hybrid Active
G417 Not reported 69 15 Other Operational
L002 Not reported n/r -28 Other Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.