Substation Scout

MISO request G225

MISO queue ID G225

Queue request G225 was listed in the MISO interconnection queue at the end of 2025 as a 60 MW gas project in Outagamie County, WI, according to Berkeley Lab’s queue data file. The filing names Kaukauna Central Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of June 1, 2004.

Queue IDG225
Project nameNot reported
Status (as published)Operational
SubstationKaukauna Central Substation
Point of interconnectionKaukauna Central Substation
CountyOutagamie
StateWI
VoltageNot reported
Capacity60 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2004-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Outagamie, WI: 12 requests in the MISO queue, 4 active totaling 860 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterG225 G225
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2002-05-06
Interconnection agreement date2003-12-23
Operational date2004-06-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first