Outagamie, WI interconnection queue

4 active projects totaling 860 MW in the MISO queue, plus 8 with terminal status (shown grayed).

4active projects
860active MW
12total filed
Queue IDProjectkVMWResourceStatus
J248 Not reported 345 675 Gas Withdrawn
G044 Not reported 345 600 Gas Operational
G101 Not reported n/r 530 Other Withdrawn
J293 Not reported 345 496 Gas Withdrawn
J2148 Not reported 138 200 Solar Withdrawn
J1567 Not reported 345 150 Solar Withdrawn
J2326 Not reported n/r 150 Battery Active
J2074 Not reported 138 100 Battery Withdrawn
G224 Not reported n/r 60 Gas Withdrawn
G225 Not reported n/r 60 Gas Operational
G231 Not reported n/r 60 Gas Withdrawn
G074 Not reported n/r 50 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.