Substation Scout

MISO request G043

MISO queue ID G043

Queue request G043 was listed in the MISO interconnection queue at the end of 2025 as a 37 MW project in Ramsey County, MN, according to Berkeley Lab’s queue data file. The filing names High Bridge Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of June 1, 2003.

Queue IDG043
Project nameNot reported
Status (as published)Operational
SubstationHigh Bridge Substation
Point of interconnectionHigh Bridge Substation
CountyRamsey
StateMN
VoltageNot reported
Capacity37 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2003-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Ramsey, MN: 5 requests in the MISO queue, 4 active totaling 683 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterG043 G043
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2000-06-21
Operational date2003-06-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first