Ramsey, MN interconnection queue

4 active projects totaling 683 MW in the MISO queue, plus 1 with terminal status (shown grayed).

4active projects
683active MW
5total filed
Queue IDProjectkVMWResourceStatus
G237 Not reported n/r 575 Gas Operational
J320 Not reported 115 55 Gas Operational
G175 Not reported n/r 49 Gas Withdrawn
G043 Not reported n/r 37 Other Operational
J4200 Not reported n/r 16 Hydro Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.