MISO request E0032

MISO queue ID E0032

Queue request E0032 was listed in the MISO interconnection queue at the end of 2025 as a 478 MW gas project in San Jacinto County, TX, according to Berkeley Lab’s queue data file. The filing names Jancinto Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 15, 2027.

Queue IDE0032
Project nameNot reported
Status (as published)Active
SubstationJancinto Substation
Point of interconnectionJancinto 230kV Substation
CountySan Jacinto
StateTX
Voltage230 kV
Capacity478 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2027-10-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

San Jacinto, TX: 6 requests in the MISO queue, 2 active totaling 628 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityEntergy Texas, Inc.
DeveloperEntergy Texas, Inc.
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Request Status: Active; Post GIA Status: Not started
Queue date2025-08-06

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.