MISO request E0032
MISO queue ID E0032
Queue request E0032 was listed in the MISO interconnection queue at the end of 2025 as a 478 MW gas project in San Jacinto County, TX, according to Berkeley Lab’s queue data file. The filing names Jancinto Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 15, 2027.
| Queue ID | E0032 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Jancinto Substation |
| Point of interconnection | Jancinto 230kV Substation |
| County | San Jacinto |
| State | TX |
| Voltage | 230 kV |
| Capacity | 478 MW |
| Resource (as published) | Gas |
| Resource category | Gas (normalized for filtering) |
| Proposed online date | 2027-10-15 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
San Jacinto, TX: 6 requests in the MISO queue, 2 active totaling 628 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Entergy Texas, Inc. |
|---|---|
| Developer | Entergy Texas, Inc. |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Study phase (as the queue printed it) | Request Status: Active; Post GIA Status: Not started |
| Queue date | 2025-08-06 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.