Substation Scout

San Jacinto, TX interconnection queue

2 active projects totaling 628 MW in the MISO queue, plus 4 with terminal status (shown grayed).

2active projects
628active MW
6total filed
Queue IDProjectkVMWResourceStatus
J487 Not reported 230 999 Gas Withdrawn
E0032 Not reported 230 478 Gas Active
J2076 Not reported 138 225 Hybrid Withdrawn
J2897 Not reported 138 150 Hybrid Active
J1186 Not reported 138 100 Solar Withdrawn
J2235 Not reported n/r 100 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.