Substation Scout

Vicksburg CCCT

MISO queue ID E0031

Vicksburg CCCT (E0031) was listed in the MISO interconnection queue at the end of 2025 as a 820 MW gas project in Warren County, MS, according to Berkeley Lab’s queue data file. The filing names Baxter Wilson Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 21, 2027.

Queue IDE0031
Project nameVicksburg CCCT
Status (as published)Active
SubstationBaxter Wilson Substation
Point of interconnectionBaxter Wilson 115kV Substation
CountyWarren
StateMS
Voltage115 kV
Capacity820 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2027-08-21
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Warren, MS: 4 requests in the MISO queue, 1 active totaling 820 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityEntergy Mississippi, LLC
DeveloperEntergy Mississippi, LLC
ClusterERAS Study Cycle 2
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Request Status: Active; Post GIA Status: Not started
Queue date2025-08-06

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first