Warren, MS interconnection queue
1 active project totaling 820 MW in the MISO queue, plus 3 with terminal status (shown grayed).
1active projects
820active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J1130 | Not reported | 500 | 1,110 | Gas | Withdrawn |
| E0031 | Vicksburg CCCT | 115 | 820 | Gas | Active |
| J3538 | Not reported | 34 | 770 | Gas | Withdrawn |
| J2902 | Not reported | 115 | 70 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.