Waterford 5
MISO queue ID E0029
Waterford 5 (E0029) was listed in the MISO interconnection queue at the end of 2025 as a 478 MW gas project in St. Charles Parish, LA, according to Berkeley Lab’s queue data file. The filing names Waterford Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 4, 2028.
| Queue ID | E0029 |
|---|---|
| Project name | Waterford 5 |
| Status (as published) | Active |
| Substation | Waterford Substation |
| Point of interconnection | Waterford 500kV Substation |
| County | St. Charles Parish |
| State | LA |
| Voltage | 500 kV |
| Capacity | 478 MW |
| Resource (as published) | Gas |
| Resource category | Gas (normalized for filtering) |
| Proposed online date | 2028-08-04 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
St. Charles Parish, LA: 7 requests in the MISO queue, 4 active totaling 1,677.3 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Entergy Louisiana, LLC |
|---|---|
| Developer | Entergy Louisiana, LLC |
| Cluster | ERAS Study Cycle 2 |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Study phase (as the queue printed it) | Request Status: Active; Post GIA Status: Not started |
| Queue date | 2025-08-06 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.