Red Butte Wind

MISO queue ID E0027

Red Butte Wind (E0027) was listed in the MISO interconnection queue at the end of 2025 as a 456.8 MW wind project in Morton County, ND, according to Berkeley Lab’s queue data file. The filing names Nelson Lake Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of February 25, 2028.

Queue IDE0027
Project nameRed Butte Wind
Status (as published)Active
SubstationNelson Lake Substation
Point of interconnectionNelson Lake 230kV Substation
CountyMorton
StateND
Voltage230 kV
Capacity456.8 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2028-02-25
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Morton, ND: 15 requests in the MISO queue, 9 active totaling 1,126.4 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityGreat River Energy (GRE)
DeveloperRed Butte Wind, LLC
ClusterERAS Study Cycle 2
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Request Status: Active; Post GIA Status: Not started
Queue date2025-08-06

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.