Morton, ND interconnection queue
9 active projects totaling 1,126.4 MW in the MISO queue, plus 6 with terminal status (shown grayed).
9active projects
1,126.4active MW
15total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J1893 | Not reported | 230 | 500 | Wind | Withdrawn |
| E0027 | Red Butte Wind | 230 | 456.8 | Wind | Active |
| J1544 | Not reported | 115 | 200 | Solar | Withdrawn |
| J2502 | Not reported | 230 | 150 | Wind | Active |
| J1193 | Not reported | 115 | 103.1 | Gas | Withdrawn |
| R1000 | Replace 103.1 MW of Heskett Units 1 & 2 with One (1) General Electric synchronous combustion turbine; Heskett 1 & 2 | n/r | 103.1 | Hybrid | Active |
| J2097 | Not reported | 230 | 100 | Wind | Active |
| J2101 | Not reported | 230 | 100 | Battery | Withdrawn |
| J2157 | Not reported | 230 | 100 | Wind | Active |
| J3070 | Not reported | 230 | 100 | Wind | Active |
| J705 | Not reported | 230 | 100 | Wind | Withdrawn |
| J706 | Not reported | 230 | 100 | Wind | Withdrawn |
| J200 | Not reported | 115 | 99 | Gas | Operational |
| G723 | Not reported | n/r | 10 | Other | Operational |
| J110 | Not reported | 41.6 | 7.5 | Other | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.