Morton, ND interconnection queue

9 active projects totaling 1,126.4 MW in the MISO queue, plus 6 with terminal status (shown grayed).

9active projects
1,126.4active MW
15total filed
Queue IDProjectkVMWResourceStatus
J1893 Not reported 230 500 Wind Withdrawn
E0027 Red Butte Wind 230 456.8 Wind Active
J1544 Not reported 115 200 Solar Withdrawn
J2502 Not reported 230 150 Wind Active
J1193 Not reported 115 103.1 Gas Withdrawn
R1000 Replace 103.1 MW of Heskett Units 1 & 2 with One (1) General Electric synchronous combustion turbine; Heskett 1 & 2 n/r 103.1 Hybrid Active
J2097 Not reported 230 100 Wind Active
J2101 Not reported 230 100 Battery Withdrawn
J2157 Not reported 230 100 Wind Active
J3070 Not reported 230 100 Wind Active
J705 Not reported 230 100 Wind Withdrawn
J706 Not reported 230 100 Wind Withdrawn
J200 Not reported 115 99 Gas Operational
G723 Not reported n/r 10 Other Operational
J110 Not reported 41.6 7.5 Other Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first