Faribault Energy Park
MISO queue ID E0023
Faribault Energy Park (E0023) was listed in the MISO interconnection queue at the end of 2025 as a 393.6 MW gas project in Rice County, MN, according to Berkeley Lab’s queue data file. The filing names Fairbault Energy Park as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of July 3, 2028.
| Queue ID | E0023 |
|---|---|
| Project name | Faribault Energy Park |
| Status (as published) | Active |
| Substation | Fairbault Energy Park |
| Point of interconnection | Fairbault Energy Park |
| County | Rice |
| State | MN |
| Voltage | Not reported |
| Capacity | 393.6 MW |
| Resource (as published) | Gas |
| Resource category | Gas (normalized for filtering) |
| Proposed online date | 2028-07-03 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Rice, MN: 7 requests in the MISO queue, 2 active totaling 693.6 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | MMPA (Minnesota Municipal Power Agency) |
|---|---|
| Developer | MMPA (Minnesota Municipal Power Agency) |
| Cluster | ERAS Study Cycle 1 |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Study phase (as the queue printed it) | Request Status: Done |
| Queue date | 2025-08-06 |
| Interconnection agreement date | 2025-11-25 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.