Substation Scout

Rice, MN interconnection queue

2 active projects totaling 693.6 MW in the MISO queue, plus 5 with terminal status (shown grayed).

2active projects
693.6active MW
7total filed
Queue IDProjectkVMWResourceStatus
E0023 Faribault Energy Park n/r 393.6 Gas Active
G173 Not reported 115 300 Gas Operational
G924 Not reported n/r 300 Wind Withdrawn
H066 Not reported 69 70 Wind Withdrawn
G336 Not reported n/r 55 Gas Withdrawn
H056 Not reported 69 40 Wind Withdrawn
H068 Not reported n/r 40 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first